800-497-4030
Industrial Loss Consultants
  • About Us
    • About Us
    • Events
    • Commitment to Diversity
  • Our Services
    • Services Provided
    • Our Process
    • Area of Expertise
    • Types of Losses
    • Who We Serve
    • Cause and Origin
    • Project Recaps
  • Submit An Assignment
  • About Us
    • About Us
    • Events
    • Commitment to Diversity
  • Our Services
    • Services Provided
    • Our Process
    • Area of Expertise
    • Types of Losses
    • Who We Serve
    • Cause and Origin
    • Project Recaps
  • Submit An Assignment

Toyota HSP 550 Machining Center

3/30/2016

0 Comments

 
ILC Consulting Service Assignment:
  • Conduct inspection, evaluation of equipment/parts damage and provide adjuster with a report.
  • Provide RCV and ACV for Toyota HSP 550 Machining Center.
  • Provide photographic record loss site and damages sustained to the Machining center as a result of the accident.
  • Provide cost to salvage damaged unit or repair to sell back to manufacturer to recover some of the loss.
ILC Findings:
  • Brand new Toyota HSP Machining Center dropped during delivery by movers.
  • Shipping company only had $100,000.00 of insurance coverage. 
  • Machining Center’s cost new was $350,000.00 with a 6-8 month lead time.
  • Insured needed machine to start new production line with contract in two months or face contract dispute which involved forfeiting $1,000,000.00 per month.
  • Located a demonstrator model at a dealer in Los Angeles.
  • Worked with insured to have demonstrator cabinet retrofitted for current installation and location.
  • Worked with manufacturer to ship machine back to manufacturing plant for factory repairs. 
Summary:
  • Written report of ILC findings provided to client.
  • After repairs the manufacturer was able to sell a machine that would have been sold for pennies on the dollar as a remanufactured model at a discount of $100,000.00.
  • This allowed the insurance company to save money as well as the underinsured. Most importantly we were able to help the insured out of an unfortunate delivery situation and with loss of business. 
  • Assisted in meeting deadlines and finding a solution to a loss that could have been in the hundreds of thousands of dollars but was diminished to a net cost of around $35,000.00 plus fees
Picture
Author: Gary Finley
Download PDF
0 Comments



Leave a Reply.

    Archives

    August 2016
    June 2016
    April 2016
    March 2016
    October 2015

    Categories

    All
    #2016 PLRB
    Aluminum Plant
    Business Interruption
    Caterpillar 3306
    CAT Response Teams
    Clerk Of The Works
    Flood
    Hurricane
    Louisianafloods2016
    M&E Recovery
    Mexico
    Oil Starvation
    Texas
    Toyota HSP 550 Machining Center
    Troplical Storm
    Underinsured

    RSS Feed

Industrial Loss Consultants Inc

1699 Wall Street, Suite 218 
Mount Prospect, IL 60056
Phone: (800) 497-4030

About Us

Events

​Services Provided

Our Process

Area Of Expertise

Types Of Losses

Who We Serve

Contact Us
Submit an Assignment
© 2022 Industrial Loss Consultants Inc, All Rights Reserved
Website by RBA Web Design & Technology